An official authorization to perform construction work covered by the permit. The reviewing authority checks the proposal against applicable building codes and other requirements, with inspections generally required during construction. Some work is exempt from building permits, while electrical, plumbing, mechanical, grading, and other activities may require separate approvals.
An approval for regulated earthwork, such as excavation, filling, or reshaping land. Review may address slope stability, drainage, erosion control, and protection of neighboring property. Permit thresholds and exemptions vary by jurisdiction. A grading permit does not replace other required environmental, tree, or construction approvals.
An approval to remove a structure when a demolition permit is required. The process may involve utility disconnections, asbestos requirements, site protection, demolition delays, or deconstruction rules. Existing structures do not always need to be removed for redevelopment; whether they can remain depends on the proposed layout and applicable requirements.
An authorization allowing certain privately owned structures or improvements to occupy public right of way. Examples can include retaining walls, stairs, or other features extending beyond the private property boundary. The permit may be revocable and include maintenance, insurance, or removal obligations. Temporary street use and construction work may require different permits. Portland.gov
A general term for permission to perform specified work or activities within public right of way. Depending on the agency and activity, this may involve street openings, utility installation, frontage improvements, traffic control, or temporary street use. The required permit type depends on the work and the authority controlling the road.
An approval required for regulated development within a designated flood hazard area. Development can include grading, filling, paving, and other site changes—not just construction of buildings. Review addresses applicable floodplain standards, which may include elevation, floodproofing, drainage, and protection of floodplain functions. The requirements depend on the location and proposed work. www.portland.gov
An approval for a use that the zoning code allows subject to additional review and specific approval criteria. Review may address compatibility, operating characteristics, traffic, or impacts on nearby properties. Approval is not automatic, and conditions may affect the project’s layout or operation. A conditional use permit does not authorize a use the code does not provide a path to approve.
An approval allowing a departure from a particular development standard when the applicable variance criteria are met. It may address requirements such as setbacks, height, or lot dimensions, depending on local rules. A variance is not a general exemption from zoning. Some Oregon jurisdictions use adjustments or other procedures for certain modifications to development standards.
A term used by some jurisdictions for approval of a use requiring additional review or safeguards. It may resemble a conditional use permit, but the meaning, criteria, and procedure depend on the local code. In Oregon, the applicable jurisdiction’s terminology should be checked rather than assuming a special use permit is a separate, universally available approval.
A process allowing a site to be planned as a coordinated development with flexibility from certain standard zoning requirements. Depending on the local code, it may allow alternative lot arrangements, clustered buildings, shared open space, or other design approaches. Flexibility must meet established approval criteria; a separate negotiated development agreement is not always required. Portland.gov
The process of changing the zoning designation or zoning regulations applicable to property. A zone change may expand development options, but it must satisfy the applicable approval criteria and remain consistent with the comprehensive plan or be accompanied by an appropriate plan amendment. Procedures vary, and a change does not automatically increase land value or guarantee a profitable project.
A change to a jurisdiction’s long-range land use plan. “General plan” is terminology commonly used in California; Oregon generally uses “comprehensive plan.” In Oregon, a comprehensive plan amendment may change policies or a property’s plan-map designation. It may be needed when a proposed zoning change is inconsistent with the existing plan.
A detailed planning framework for a defined area, addressing land uses, infrastructure, development standards, and implementation. “Specific plan” has a particular statutory meaning in California. Oregon jurisdictions may use area plans, community plans, concept plans, master plans, or plan districts for related purposes. Their legal effect depends on how they are adopted and incorporated into local regulations.
A binding agreement between a developer or property owner and a local government addressing development of a property. It may establish obligations, infrastructure commitments, phasing, and certain applicable development requirements for a defined period. Oregon authorizes development agreements under ORS 94.504 through 94.528. Their protections depend on the statute and agreement; they do not automatically exempt a project from every future regulation. www.oregonlegislature.gov
A preliminary map showing a proposed land division before the final legal document is recorded. Terminology varies: Oregon jurisdictions commonly refer to tentative plans, preliminary plats, or preliminary land division approvals. This stage establishes the proposed layout and conditions that must be addressed before final plat approval and recording. Preliminary approval alone does not create separate legal lots or parcels.
A term used in some states for the final survey document establishing an approved subdivision. Oregon generally uses “final plat” or “subdivision plat.” The plat must satisfy applicable requirements, obtain required approvals, and be recorded to establish the new lots. Recording does not, by itself, establish that every lot is ready for a building permit.
A land division document whose meaning depends on the jurisdiction. In California, parcel maps are generally associated with divisions creating four or fewer parcels, subject to exceptions. Oregon uses “partition plat” for a partition, generally creating two or three parcels within a calendar year, and “subdivision plat” for a subdivision, generally creating four or more lots. A tax-lot map alone does not establish that a parcel was legally created.
The National Environmental Policy Act, a federal law requiring environmental review of qualifying federal agency actions. A development project may encounter NEPA through certain federal permits, funding decisions, or federal land involvement. The review may involve a categorical exclusion, an environmental assessment, or an environmental impact statement. NEPA does not automatically apply to every private development or every project needing a local permit. epa.gov
A detailed environmental review document prepared under the California Environmental Quality Act, or CEQA, when required. It evaluates significant environmental effects, alternatives, and mitigation measures. An EIR is not Oregon’s standard statewide land development review document. Under federal NEPA procedures, the comparable detailed document is called an environmental impact statement, or EIS. Caltrans
A California CEQA document used when identified potentially significant environmental effects can be reduced to a less-than-significant level through project revisions or mitigation. The measures become enforceable obligations associated with the project. This is California terminology and should not be presented as a routine Oregon land use approval or as the name of a federal NEPA document. wildlife.ca.gov
A category of federal actions determined normally not to have significant environmental effects and therefore generally not to require an environmental assessment or environmental impact statement under NEPA. The agency must determine that the action qualifies under its applicable procedures, including any extraordinary-circumstances review. A categorical exclusion does not eliminate other permit requirements or environmental obligations. NEPA/CEQ
Actions intended to avoid, minimize, restore, or compensate for impacts associated with a project. Examples include modifying a site layout, restoring habitat, controlling construction runoff, or improving transportation facilities. Required measures must be supported by the applicable regulatory authority. They can affect construction costs, usable area, timing, and ongoing maintenance obligations.
A federal authorization for activities within the U.S. Army Corps of Engineers’ regulatory jurisdiction. Section 404 permits address discharges of dredged or fill material into waters of the United States, including jurisdictional wetlands. Section 10 permits address certain work in navigable waters. State and local approvals may also be required, and the appropriate authorization depends on the activity and affected resource. www.nwp.usace.army.mil
Terminology associated particularly with California’s State Water Resources Control Board and regional water boards. Oregon’s relevant water-quality approvals are generally administered by the Department of Environmental Quality or an authorized local program. Examples include construction stormwater permit coverage and Section 401 water quality certification. Oregon Department of State Lands removal-fill permits and water-right approvals are separate requirements.
A general term for public-health review required for certain projects or facilities. In Oregon, septic approvals are issued by DEQ or an authorized local onsite wastewater program. Private wells and public drinking-water systems involve different state and local requirements. The responsible authority must be identified rather than assuming the local health department approves every septic system and well.
Review by the responsible fire authority or fire-code official for applicable fire and life-safety requirements. For development sites, this may include emergency access, road grades, turning areas, hydrants, firefighting water supply, and fire protection systems. Requirements can influence site layout and infrastructure costs. Approval may occur through land use review, construction permitting, or separate fire permits.
Review of proposed infrastructure by the responsible engineering, transportation, utility, or public works authority. It may cover roads, sidewalks, drainage, sewer, water, and related improvements. Engineering approval, construction authorization, inspection, and acceptance for public maintenance may be separate steps. Approval of plans does not necessarily mean a public agency has accepted the completed infrastructure.
Charges associated with development that help fund school facilities where authorized and adopted. In Oregon, a relevant example is the school construction excise tax, which can apply to qualifying residential and nonresidential construction. Applicability, exemptions, rates, and collection timing should be confirmed locally. These charges are distinct from ordinary utility and transportation system development charges. www.portland.gov
Confirmation or authorization from a utility provider concerning service to a proposed development. It may involve capacity review, connection requirements, main extensions, easements, design approval, or service agreements. A preliminary availability statement does not necessarily reserve capacity or authorize construction. Each provider’s requirements and the project’s approval conditions determine what must be completed and when.
The formal delivery of an application and supporting materials to the agency responsible for review. A submittal may include plans, reports, written findings, ownership information, and fees. Submitting an application does not establish that it is complete or approvable. Preparing the required materials carefully can reduce requests for additional information and avoid unnecessary delays.
An agency’s initial determination of whether an application includes the information required for review. The agency may identify missing materials and request additional information. A completeness determination is separate from a finding that the proposal meets approval criteria. Oregon statutes and local procedures establish applicable requirements and deadlines for different application types.
Formal notification of an application, hearing, proposed action, or decision. Depending on the procedure, notice may involve mailed notices, site posting, publication, or other methods. It explains opportunities to comment or appeal and may establish important deadlines. Public comments can identify issues, but land use decisions must follow the applicable legal standards.
A formal proceeding at which a decision-making body receives evidence and testimony concerning a proposal. Depending on the process, a decision may follow the hearing or be issued later. Oregon quasi-judicial land use hearings involve procedural requirements and application of approval criteria. A public hearing is not required for every development application.
An appointed local body with responsibilities established by state law and local regulations. It may recommend planning policies and zoning changes, conduct hearings, or decide certain applications. Responsibilities differ among jurisdictions. In Portland, the Planning Commission primarily makes recommendations to City Council on long-range planning matters; it is not the first decision-maker for every development application. www.portland.gov
A decision by a city’s elected governing body when the applicable procedure assigns it that responsibility. City councils may adopt planning legislation, decide certain applications, or hear local appeals. Many development approvals are instead issued by staff, hearings officers, or other designated bodies. Council approval may still be subject to appeal and does not replace required construction permits.
Requirements attached to an approval that must be satisfied at specified stages or throughout the approved use. Conditions may address infrastructure, design revisions, easements, mitigation, reporting, or maintenance. Some must be met before final plat recording or permit issuance, while others apply during construction or operation. Their costs and timing should be evaluated alongside the approved development plan.
The procedure for challenging a decision through the authorized local or state review process. Appeal rights depend on the decision type, participation requirements, standing, and deadlines. In Oregon, many final local land use decisions can be appealed to the Land Use Board of Appeals after required local remedies are exhausted. Not every permit dispute follows the same appeal route. www.oregon.gov
A general term describing protection against certain changes in the rules applicable to a project. In Oregon, this can involve statutory rules identifying applicable approval standards, a development agreement, or common-law vested rights based on the circumstances and work performed. Filing an application or obtaining one approval does not guarantee permanent protection from all future regulations. Approval expiration dates and extension requirements still matter.
Knowing the terminology is a starting point. Understanding which approvals apply, how they fit together, and what they may require takes a closer look at the property and proposed development.