The process of reshaping land to establish elevations and slopes suitable for a proposed development. It can involve excavation, filling, and preparation for roads, buildings, and drainage. Costs depend on factors such as terrain, soil suitability, rock, groundwater, and material hauling. Grading may require permits, erosion controls, and geotechnical oversight.
The excavation of material from higher areas and placement of suitable material in lower areas to achieve the planned grades. A balanced site aims to limit the need to import or export material. However, equal excavation and fill volumes do not automatically create a usable balance because soil suitability, moisture, shrinkage, and expansion during handling also matter.
The activities involved in excavating, moving, placing, and compacting soil or rock for a project. Earthwork may include mass grading, utility trenches, building excavations, and embankments. Costs depend on the quantities and characteristics of the material, equipment access, groundwater, disposal options, and construction sequence.
The controlled densification of soil or aggregate to meet specified engineering requirements. It is commonly used in structural fills, road foundations, and utility trench backfill to reduce settlement and improve support. Requirements depend on the material and intended use. Field testing helps verify that placement, moisture, and density meet the project specifications.
The stage of earthwork that establishes the site’s general elevations, slopes, and major landforms. It may create building pads, road corridors, and preliminary drainage paths. Rough grading generally precedes final surface preparation, although it may overlap with utility and other construction activities. Temporary drainage and erosion control remain important throughout this work.
The precise shaping of a surface to the required elevations and slopes before the next construction or landscaping activity. It may prepare road subgrades, pavement bases, building areas, or landscape surfaces. Fine grading helps achieve drainage and construction tolerances. It is not necessarily the last grading activity across the entire project.
The requirements governing the design and construction of streets and related facilities. They may address lane widths, grades, pavement, sidewalks, bicycle facilities, drainage, intersections, and utilities. Standards vary by road authority, street classification, and whether the road is public or private. Public acceptance may also require inspections, testing, documentation, and completion of other obligations.
A cross-sectional representation of a road showing its dimensions and components. Depending on the drawing, it may include travel lanes, sidewalks, bicycle facilities, curbs, drainage, pavement layers, and utility locations. The required section affects construction costs and the land needed for the road corridor. The applicable authority determines the standards for the particular road.
An edge treatment that separates the roadway from adjacent areas and, where a gutter is included, helps convey runoff toward collection points. It is commonly constructed from concrete. Requirements vary by street type and drainage approach; some roads use shoulders, swales, or other alternatives. Its location and design affect road construction and stormwater management.
A dead-end street with a turnaround, commonly circular, at its terminus. It can provide access where a through connection is unavailable or not required. Local street-connectivity policies and emergency-access standards may limit its use or length. The turnaround occupies land and must accommodate the vehicles identified by the applicable design requirements.
A turnaround with a T-shaped or similar arrangement allowing vehicles to reverse direction through a series of movements. It may be considered where a circular turnaround is impractical, subject to approval. Dimensions, grades, clearances, and parking restrictions depend on the required design vehicle and applicable standards. A hammerhead is not automatically an acceptable substitute for a cul-de-sac.
A technical evaluation of how a proposed development affects the transportation system. It may examine vehicle trips, intersections, safety, access, walking, bicycling, transit, and potential improvements. Study requirements depend on the project and reviewing agencies. Findings can influence access design and mitigation requirements, but the project’s obligations must be established through the applicable approval process.
A measure describing operating conditions or quality of service for a transportation facility. Vehicle LOS commonly uses ratings from A through F, with the specific calculation depending on the facility. Oregon agencies may also use volume-to-capacity ratios, safety measures, and multimodal performance measures. LOS is not the sole approval standard for every road or development proposal. oregon.gov
New utility infrastructure connecting a development to an existing service network. Extensions may require design, permits, easements, road crossings, and improvements beyond the property. Distance is only one cost factor; capacity, terrain, depth, construction conditions, and provider requirements also matter. The agreement with each provider determines responsibility for construction, costs, ownership, and maintenance.
A principal pipe within a water distribution system that supplies service connections, hydrants, or other parts of the network. Its design must address the provider’s requirements and the proposed demand. Pipe size alone does not establish adequate service or fire flow; pressure, supply, storage, and the surrounding network also matter. Required extensions or upgrades can significantly affect development costs.
A principal wastewater collection pipe receiving flows from service connections or smaller lines. Gravity mains rely on appropriate slopes and elevations, while pressurized sewer lines convey pumped wastewater. Development may require extensions, capacity improvements, or pumping facilities. Ownership and maintenance responsibilities depend on whether the system is public, private, or operated by a service district.
A common development term for services such as electricity, natural gas, telecommunications, cable, and fiber. Responsibilities for trenching, conduit, equipment, installation, and restoration vary among providers and projects. Coordination must account for easements, separation requirements, road construction, and service lead times. Not every development requires or receives every type of dry utility.
A wastewater pumping facility used where gravity conveyance alone cannot move sewage to the required location or elevation. It may include pumps, controls, storage, backup provisions, and a force main. Feasibility depends on construction costs, energy use, maintenance, reliability, and provider acceptance. Public and private lift stations can create different ownership and long-term operating obligations.
The required water flow available for firefighting, generally evaluated at a specified residual pressure and for a required duration. Requirements depend on the applicable fire code, building characteristics, and approved fire-protection measures. Meeting them may require system improvements or an approved alternative water supply. Fire flow is different from the water demand associated with ordinary domestic use. oregon.gov
A branch connection serving a particular property or building from a utility main or distribution line. The term is especially common for sewer connections, while other utilities may use different terminology. Required connections and any permitted shared arrangements depend on provider rules and project design. Ownership and maintenance responsibilities can change at specified points along the connection.
A stormwater basin that temporarily stores runoff and releases it at a controlled rate. It is commonly used to reduce peak flows entering downstream drainage systems. A dry detention basin normally drains between storms, while some facilities combine detention storage with a permanent pool. Land requirements depend on runoff, soils, outlet conditions, and applicable design standards.
A term commonly used for a stormwater pond with a permanent pool, although terminology varies among manuals and jurisdictions. Such a facility may also discharge water through a controlled outlet and provide temporary storage above the permanent pool. Other systems retain runoff through infiltration or reuse. The name alone does not establish how a facility functions or how much land it requires. epa.gov
A shallow channel used to convey runoff across a site. A vegetated swale may also slow flows and provide water-quality treatment; some designs support infiltration where conditions permit. Performance depends on slope, soil, vegetation, flow, and maintenance. A swale does not automatically replace every pipe, treatment facility, or flow-control requirement.
The facilities used to collect, convey, and manage stormwater. Components may include inlets, pipes, culverts, open channels, treatment facilities, and flow-control structures. The appropriate system depends on the site, receiving drainage system, and local requirements. An approved discharge location, adequate capacity, and long-term maintenance arrangements may be needed.
A surface that prevents or substantially limits water from soaking into the underlying ground. Common examples include conventional roofs, pavement, and concrete. Impervious area influences runoff volumes and the stormwater facilities a project may require. Regulatory definitions and the treatment of surfaces such as gravel or permeable pavement vary by jurisdiction.
An approach to site planning and stormwater management that seeks to preserve or mimic natural hydrologic processes. Techniques may include rain gardens, vegetated facilities, permeable surfaces, and rainwater collection. They manage runoff near its source through infiltration, evaporation, plant use, or reuse. Suitability depends on site conditions, and LID does not eliminate every need for conventional drainage infrastructure. epa.gov
The engineering discipline involved in planning and designing infrastructure such as roads, grading, drainage, water, and wastewater systems. On development projects, civil engineers coordinate designs with surveys, geotechnical findings, utility requirements, and agency standards. Their work can include calculations, reports, improvement plans, estimates, and construction support. Other licensed professionals may be required for specialized parts of the project.
Engineering drawings and supporting specifications describing proposed site and infrastructure improvements. They may cover grading, streets, utilities, drainage, erosion control, and construction details. Agencies and service providers review the portions within their authority. Approval of improvement plans does not automatically replace every construction permit, environmental authorization, or property right needed to perform the work.
The costs associated with providing the roads, utilities, drainage, grading, and related improvements needed to serve a project. Depending on the budget, associated engineering, permits, fees, and contingencies may be tracked separately. Higher infrastructure costs generally reduce the amount remaining for land and profit, assuming other project inputs remain unchanged. Infrastructure can also create value by making development possible.
Improvements outside the development property, such as utility extensions, frontage work, road widening, or intersection upgrades. They may be required to provide service, address project impacts, or meet applicable development standards. These improvements can directly benefit the project, even though they are outside its boundaries. Their scope, cost allocation, easements, and any reimbursement arrangements should be evaluated early.
A general term for charges associated with the infrastructure needs of new development. In Oregon, system development charges, or SDCs, are a major example and have a statutory framework covering water, wastewater, drainage and flood control, transportation, and parks and recreation. School construction excise taxes are separate. Charges, credits, exemptions, and payment timing depend on the applicable law and provider. oregonlegislature.gov
Charges associated with establishing utility service or connecting to an existing system. Depending on the provider, these may cover activities such as tapping a main, installing a meter, inspection, or other service work. They may be separate from, or included alongside, capacity-related charges and SDCs. The fee schedule should be reviewed to avoid omissions or double-counting in the development budget.
An estimate of construction quantities and costs prepared by an engineer using the available design and pricing information. It can support feasibility analysis, budgeting, or the calculation of required improvement security. Its reliability depends on design detail, assumptions, exclusions, market conditions, and contingencies. It is not a contractor’s binding bid or a guarantee of the final construction cost.
Knowing the terminology is a starting point. Understanding how grading, roads, utilities, drainage, and engineering requirements affect a property takes a closer look at the site and proposed development.