PERMITTING
AND APPROVALS

Developing land often requires several different approvals. Land use decisions establish whether a proposal meets planning and zoning requirements, while construction permits and agency reviews address how the project can be built. This section of the Oregon Land Development Glossary explains common permits, review procedures, and approval terms. Some terminology comes from other states; those entries explain the distinction and identify the relevant Oregon terminology.

On This Page

  1. Building Permit
  2. Grading Permit
  3. Demolition Permit
  4. Encroachment Permit
  5. Right of Way Permit
  6. Floodplain Development Permit
  7. Conditional Use Permit (CUP)
  8. Variance
  9. Special Use Permit
  10. Planned Unit Development (PUD)
  11. Rezoning / Zone Change
  12. General Plan Amendment
  13. Specific Plan
  14. Development Agreement
  15. Tentative Map
  16. Final Map
  17. Parcel Map
  18. NEPA
  19. Environmental Impact Report (EIR)
  20. Mitigated Negative Declaration
  21. Categorical Exclusion
  22. Mitigation Measures
  23. Army Corps of Engineers Permit
  24. State Water Board Permit
  25. Health Department Approval
  26. Fire Department Approval
  27. Public Works Approval
  28. School District Fees
  29. Utility Provider Approval
  30. Application Submittal
  31. Completeness Review
  32. Public Notice
  33. Public Hearing
  34. Planning Commission
  35. City Council Approval
  36. Conditions of Approval
  37. Appeals Process
  38. Vesting

 

Building Permit

An official authorization to perform construction work covered by the permit. The reviewing authority checks the proposal against applicable building codes and other requirements, with inspections generally required during construction. Some work is exempt from building permits, while electrical, plumbing, mechanical, grading, and other activities may require separate approvals.

 

Grading Permit

An approval for regulated earthwork, such as excavation, filling, or reshaping land. Review may address slope stability, drainage, erosion control, and protection of neighboring property. Permit thresholds and exemptions vary by jurisdiction. A grading permit does not replace other required environmental, tree, or construction approvals.

 

Demolition Permit

An approval to remove a structure when a demolition permit is required. The process may involve utility disconnections, asbestos requirements, site protection, demolition delays, or deconstruction rules. Existing structures do not always need to be removed for redevelopment; whether they can remain depends on the proposed layout and applicable requirements.

 

Encroachment Permit

An authorization allowing certain privately owned structures or improvements to occupy public right of way. Examples can include retaining walls, stairs, or other features extending beyond the private property boundary. The permit may be revocable and include maintenance, insurance, or removal obligations. Temporary street use and construction work may require different permits. Portland.gov

 

Right of Way Permit

A general term for permission to perform specified work or activities within public right of way. Depending on the agency and activity, this may involve street openings, utility installation, frontage improvements, traffic control, or temporary street use. The required permit type depends on the work and the authority controlling the road.

 

Floodplain Development Permit

An approval required for regulated development within a designated flood hazard area. Development can include grading, filling, paving, and other site changes—not just construction of buildings. Review addresses applicable floodplain standards, which may include elevation, floodproofing, drainage, and protection of floodplain functions. The requirements depend on the location and proposed work. www.portland.gov

 

Conditional Use Permit (CUP)

An approval for a use that the zoning code allows subject to additional review and specific approval criteria. Review may address compatibility, operating characteristics, traffic, or impacts on nearby properties. Approval is not automatic, and conditions may affect the project’s layout or operation. A conditional use permit does not authorize a use the code does not provide a path to approve.

 

Variance

An approval allowing a departure from a particular development standard when the applicable variance criteria are met. It may address requirements such as setbacks, height, or lot dimensions, depending on local rules. A variance is not a general exemption from zoning. Some Oregon jurisdictions use adjustments or other procedures for certain modifications to development standards.

 

Special Use Permit

A term used by some jurisdictions for approval of a use requiring additional review or safeguards. It may resemble a conditional use permit, but the meaning, criteria, and procedure depend on the local code. In Oregon, the applicable jurisdiction’s terminology should be checked rather than assuming a special use permit is a separate, universally available approval.

 

Planned Unit Development (PUD)

A process allowing a site to be planned as a coordinated development with flexibility from certain standard zoning requirements. Depending on the local code, it may allow alternative lot arrangements, clustered buildings, shared open space, or other design approaches. Flexibility must meet established approval criteria; a separate negotiated development agreement is not always required. Portland.gov

 

Rezoning / Zone Change

The process of changing the zoning designation or zoning regulations applicable to property. A zone change may expand development options, but it must satisfy the applicable approval criteria and remain consistent with the comprehensive plan or be accompanied by an appropriate plan amendment. Procedures vary, and a change does not automatically increase land value or guarantee a profitable project.

 

General Plan Amendment

A change to a jurisdiction’s long-range land use plan. “General plan” is terminology commonly used in California; Oregon generally uses “comprehensive plan.” In Oregon, a comprehensive plan amendment may change policies or a property’s plan-map designation. It may be needed when a proposed zoning change is inconsistent with the existing plan.

 

Specific Plan

A detailed planning framework for a defined area, addressing land uses, infrastructure, development standards, and implementation. “Specific plan” has a particular statutory meaning in California. Oregon jurisdictions may use area plans, community plans, concept plans, master plans, or plan districts for related purposes. Their legal effect depends on how they are adopted and incorporated into local regulations.

 

Development Agreement

A binding agreement between a developer or property owner and a local government addressing development of a property. It may establish obligations, infrastructure commitments, phasing, and certain applicable development requirements for a defined period. Oregon authorizes development agreements under ORS 94.504 through 94.528. Their protections depend on the statute and agreement; they do not automatically exempt a project from every future regulation. www.oregonlegislature.gov

 

Tentative Map

A preliminary map showing a proposed land division before the final legal document is recorded. Terminology varies: Oregon jurisdictions commonly refer to tentative plans, preliminary plats, or preliminary land division approvals. This stage establishes the proposed layout and conditions that must be addressed before final plat approval and recording. Preliminary approval alone does not create separate legal lots or parcels.

 

Final Map

A term used in some states for the final survey document establishing an approved subdivision. Oregon generally uses “final plat” or “subdivision plat.” The plat must satisfy applicable requirements, obtain required approvals, and be recorded to establish the new lots. Recording does not, by itself, establish that every lot is ready for a building permit.

 

Parcel Map

A land division document whose meaning depends on the jurisdiction. In California, parcel maps are generally associated with divisions creating four or fewer parcels, subject to exceptions. Oregon uses “partition plat” for a partition, generally creating two or three parcels within a calendar year, and “subdivision plat” for a subdivision, generally creating four or more lots. A tax-lot map alone does not establish that a parcel was legally created.

 

NEPA

The National Environmental Policy Act, a federal law requiring environmental review of qualifying federal agency actions. A development project may encounter NEPA through certain federal permits, funding decisions, or federal land involvement. The review may involve a categorical exclusion, an environmental assessment, or an environmental impact statement. NEPA does not automatically apply to every private development or every project needing a local permit. epa.gov

 

Environmental Impact Report (EIR)

A detailed environmental review document prepared under the California Environmental Quality Act, or CEQA, when required. It evaluates significant environmental effects, alternatives, and mitigation measures. An EIR is not Oregon’s standard statewide land development review document. Under federal NEPA procedures, the comparable detailed document is called an environmental impact statement, or EIS. Caltrans

 

Mitigated Negative Declaration

A California CEQA document used when identified potentially significant environmental effects can be reduced to a less-than-significant level through project revisions or mitigation. The measures become enforceable obligations associated with the project. This is California terminology and should not be presented as a routine Oregon land use approval or as the name of a federal NEPA document. wildlife.ca.gov

 

Categorical Exclusion

A category of federal actions determined normally not to have significant environmental effects and therefore generally not to require an environmental assessment or environmental impact statement under NEPA. The agency must determine that the action qualifies under its applicable procedures, including any extraordinary-circumstances review. A categorical exclusion does not eliminate other permit requirements or environmental obligations. NEPA/CEQ

 

Mitigation Measures

Actions intended to avoid, minimize, restore, or compensate for impacts associated with a project. Examples include modifying a site layout, restoring habitat, controlling construction runoff, or improving transportation facilities. Required measures must be supported by the applicable regulatory authority. They can affect construction costs, usable area, timing, and ongoing maintenance obligations.

 

Army Corps of Engineers Permit

A federal authorization for activities within the U.S. Army Corps of Engineers’ regulatory jurisdiction. Section 404 permits address discharges of dredged or fill material into waters of the United States, including jurisdictional wetlands. Section 10 permits address certain work in navigable waters. State and local approvals may also be required, and the appropriate authorization depends on the activity and affected resource. www.nwp.usace.army.mil

 

State Water Board Permit

Terminology associated particularly with California’s State Water Resources Control Board and regional water boards. Oregon’s relevant water-quality approvals are generally administered by the Department of Environmental Quality or an authorized local program. Examples include construction stormwater permit coverage and Section 401 water quality certification. Oregon Department of State Lands removal-fill permits and water-right approvals are separate requirements.

 

Health Department Approval

A general term for public-health review required for certain projects or facilities. In Oregon, septic approvals are issued by DEQ or an authorized local onsite wastewater program. Private wells and public drinking-water systems involve different state and local requirements. The responsible authority must be identified rather than assuming the local health department approves every septic system and well.

 

Fire Department Approval

Review by the responsible fire authority or fire-code official for applicable fire and life-safety requirements. For development sites, this may include emergency access, road grades, turning areas, hydrants, firefighting water supply, and fire protection systems. Requirements can influence site layout and infrastructure costs. Approval may occur through land use review, construction permitting, or separate fire permits.

 

Public Works Approval

Review of proposed infrastructure by the responsible engineering, transportation, utility, or public works authority. It may cover roads, sidewalks, drainage, sewer, water, and related improvements. Engineering approval, construction authorization, inspection, and acceptance for public maintenance may be separate steps. Approval of plans does not necessarily mean a public agency has accepted the completed infrastructure.

 

School District Fees

Charges associated with development that help fund school facilities where authorized and adopted. In Oregon, a relevant example is the school construction excise tax, which can apply to qualifying residential and nonresidential construction. Applicability, exemptions, rates, and collection timing should be confirmed locally. These charges are distinct from ordinary utility and transportation system development charges. www.portland.gov

 

Utility Provider Approval

Confirmation or authorization from a utility provider concerning service to a proposed development. It may involve capacity review, connection requirements, main extensions, easements, design approval, or service agreements. A preliminary availability statement does not necessarily reserve capacity or authorize construction. Each provider’s requirements and the project’s approval conditions determine what must be completed and when.

 

Application Submittal

The formal delivery of an application and supporting materials to the agency responsible for review. A submittal may include plans, reports, written findings, ownership information, and fees. Submitting an application does not establish that it is complete or approvable. Preparing the required materials carefully can reduce requests for additional information and avoid unnecessary delays.

 

Completeness Review

An agency’s initial determination of whether an application includes the information required for review. The agency may identify missing materials and request additional information. A completeness determination is separate from a finding that the proposal meets approval criteria. Oregon statutes and local procedures establish applicable requirements and deadlines for different application types.

 

Public Notice

Formal notification of an application, hearing, proposed action, or decision. Depending on the procedure, notice may involve mailed notices, site posting, publication, or other methods. It explains opportunities to comment or appeal and may establish important deadlines. Public comments can identify issues, but land use decisions must follow the applicable legal standards.

 

Public Hearing

A formal proceeding at which a decision-making body receives evidence and testimony concerning a proposal. Depending on the process, a decision may follow the hearing or be issued later. Oregon quasi-judicial land use hearings involve procedural requirements and application of approval criteria. A public hearing is not required for every development application.

 

Planning Commission

An appointed local body with responsibilities established by state law and local regulations. It may recommend planning policies and zoning changes, conduct hearings, or decide certain applications. Responsibilities differ among jurisdictions. In Portland, the Planning Commission primarily makes recommendations to City Council on long-range planning matters; it is not the first decision-maker for every development application. www.portland.gov

 

City Council Approval

A decision by a city’s elected governing body when the applicable procedure assigns it that responsibility. City councils may adopt planning legislation, decide certain applications, or hear local appeals. Many development approvals are instead issued by staff, hearings officers, or other designated bodies. Council approval may still be subject to appeal and does not replace required construction permits.

 

Conditions of Approval

Requirements attached to an approval that must be satisfied at specified stages or throughout the approved use. Conditions may address infrastructure, design revisions, easements, mitigation, reporting, or maintenance. Some must be met before final plat recording or permit issuance, while others apply during construction or operation. Their costs and timing should be evaluated alongside the approved development plan.

 

Appeals Process

The procedure for challenging a decision through the authorized local or state review process. Appeal rights depend on the decision type, participation requirements, standing, and deadlines. In Oregon, many final local land use decisions can be appealed to the Land Use Board of Appeals after required local remedies are exhausted. Not every permit dispute follows the same appeal route. www.oregon.gov

 

Vesting

A general term describing protection against certain changes in the rules applicable to a project. In Oregon, this can involve statutory rules identifying applicable approval standards, a development agreement, or common-law vested rights based on the circumstances and work performed. Filing an application or obtaining one approval does not guarantee permanent protection from all future regulations. Approval expiration dates and extension requirements still matter.

 

Have Questions About Your Property?

Knowing the terminology is a starting point. Understanding which approvals apply, how they fit together, and what they may require takes a closer look at the property and proposed development.

If you are considering selling land in the Portland metro area, contact Evan Zener with Metro Land Pro to discuss your property and potential next steps.

 

Sources and Further Reading

 

This glossary provides general educational information. Requirements vary by jurisdiction, property, and project and may change over time.