An initial review using available information to identify a property’s major opportunities, constraints, and unanswered questions. It may include zoning maps, aerial imagery, topography, utility information, and recorded documents. The goal is to decide what deserves further investigation before committing substantial time or money. A first pass does not confirm buildability, and apparent problems may require verification before conclusions are drawn.
The legal right to reach a property, commonly through frontage on a public road or an easement across another property. The existence, location, scope, and enforceability of that right must be established. A route used historically is not automatically adequate legal access for a proposed development. Legal access also does not guarantee approval of a driveway, additional traffic, or emergency vehicle access.
The practical ability to reach a property and accommodate the intended use. Terrain, road condition, width, grade, bridges, and available turning space can all affect access. A route suitable for one existing home may not support construction equipment or additional development without improvements. Physical access and legal access must both be evaluated.
The location where a driveway or access road connects a property to the road network. Approval may depend on sight distance, road classification, speed, spacing, turning movements, and traffic impacts. Existing access may also require review when its use changes. A property’s road frontage does not automatically authorize a new connection at any chosen location. oregon.gov
The length of a property boundary adjoining a road or its right of way. Local regulations may establish frontage or street-access requirements for development and land divisions, with exceptions or alternatives for certain lot types. Frontage does not necessarily establish unrestricted vehicle access, particularly along access-controlled highways. Survey information and applicable road and zoning requirements should be reviewed together.
The portion of a property potentially available for development after considering applicable setbacks, resource protections, easements, hazards, and physical constraints. The amount depends on the proposed use and development standards. Land outside a building footprint may still be needed for roads, utilities, stormwater facilities, parking, or open space. Identifying buildable area does not, by itself, establish an achievable lot or unit count.
Whether a property can obtain a legally available and adequate water supply for its intended use. Evaluation includes the service provider’s requirements, system capacity, pressure, fire flow, connection costs, and any necessary extensions. Where wells are permitted, groundwater supply, water quality, construction standards, and applicable water-use requirements must be investigated. A nearby main or neighboring well does not guarantee suitable service.
Whether a property can obtain an approved connection to a public sewer system for the proposed development. Proximity is only one factor; capacity, pipe elevations, pumping needs, service boundaries, easements, and extension requirements also matter. Where sewer is unavailable, an approved onsite wastewater system may be an alternative if allowed and feasible. An existing septic system does not establish capacity for additional development.
Requirements for managing runoff during construction and after development. Depending on the site and jurisdiction, they may address erosion, infiltration, water quality, detention, discharge rates, and an approved discharge location. Facilities can occupy land and require access, easements, and ongoing maintenance. Soil conditions, groundwater, slopes, and downstream capacity influence the available design options and costs. Portland.gov
A legal right to use a defined portion of another property for access. Its terms may address location, width, permitted users, vehicle types, maintenance, and the intensity of use. An easement serving an existing home may not authorize additional lots or broader development traffic. Access rights should also be distinguished from utility rights, which may require separate authorization.
A legal right allowing specified utility facilities or related activities on property owned by another party. It may authorize installation, operation, inspection, repair, replacement, and access. Restrictions on buildings, grading, vegetation, or other improvements depend on the easement and applicable rules. An easement’s existence does not automatically give every nearby property the right to connect to the utility. Portland.gov
A legal corridor or right established for transportation, access, utilities, or related purposes. A public road right of way may extend beyond the pavement to include shoulders, sidewalks, drainage, or other facilities. The public agency may own the land or hold an easement over privately owned land. The pavement edge is not a reliable property boundary, and work within the right of way may require authorization. Portland.gov
The geometry and arrangement of a property, including its dimensions, boundaries, frontage, narrow sections, and relationship to neighboring land. These characteristics influence building placement, road layouts, utility routes, stormwater facilities, and potential land divisions. Two properties with the same acreage can accommodate very different projects. The effect of lot shape must be evaluated alongside development standards and site constraints.
Knowing the terminology is a starting point. Understanding how access, utilities, buildable area, and site layout work together requires a closer look at the property.
If you are considering selling land in the Portland metro area, contact Evan Zener with Metro Land Pro to discuss your property and potential next steps.
These resources provide statewide information. Confirm property-specific zoning, access, utility availability, easements, and development requirements with the applicable city, county, road authority, and service providers.
This glossary provides general educational information. Requirements vary by jurisdiction, property, and project and may change over time.